Magic Allianz, MiCo Milan

“Magic Allianz” saw exceptional guests on stage who illustrated “the strategy, the objectives for the immediate future and shared the resources and tools put in place by Allianz for its professional agents”.

A one-of-a-kind event, embellished by the incredible scenographic project set up by Dhs Event Solution.

A LED wall of over 500 m2 with an innovative design, made up of tiles of different sizes, part of which transformed into a walkable surface to act as a stage of the “Magic Allianz” enormous event.

The team of technicians and professionals from Dhs Event solution was responsible for the design and implementation of the entire structure, specially assembled and built according to the location.

Over 1500 tiles, for a total of over 48 million pixels, arranged and managed individually to be adapted to the different pitch of the panels.

All this required an enormous commitment in terms of human resources and time.

With around 60 days of preparation and two weeks of work, including assembly, set-up and event.

All achieved thanks to the commitment of over 50 industry experts including fitters, editors, lighting designers, audio and video technicians.

In addition to a technical director involved in managing the entire event also in live streaming.

Dentsu Creative Comes to Town, Milan
D-Day, Port of Genoa

Magic Allianz, MiCo Milan

“Magic Allianz” saw exceptional guests on stage who illustrated “the strategy, the objectives for the immediate future and shared the resources and tools put in place by Allianz for its professional agents”.

A one-of-a-kind event, embellished by the incredible scenographic project set up by Dhs Event Solution.

A LED wall of over 500 m2 with an innovative design, made up of tiles of different sizes, part of which transformed into a walkable surface to act as a stage of the “Magic Allianz” enormous event.

The team of technicians and professionals from Dhs Event solution was responsible for the design and implementation of the entire structure, specially assembled and built according to the location.

Over 1500 tiles, for a total of over 48 million pixels, arranged and managed individually to be adapted to the different pitch of the panels.

All this required an enormous commitment in terms of human resources and time.

With around 60 days of preparation and two weeks of work, including assembly, set-up and event.

All achieved thanks to the commitment of over 50 industry experts including fitters, editors, lighting designers, audio and video technicians.

In addition to a technical director involved in managing the entire event also in live streaming.